My Film Opening Sequence



My Film Opening Sequence
Showing posts with label AS Contruction. Show all posts
Showing posts with label AS Contruction. Show all posts

Thursday, 10 March 2016

Construction Post 10: Looking back - reflections on our final outcome

I feel that our project as a whole was extremely well organised and successful. This was done as our group worked well as a team which is a key part of our success.








The final capture scene where I would have added a few more shots.










Our teachers and TA really liked our final opening sequence, most saying that they would definitely watch the rest of the film. “I really liked how it ended on a close up of the hacker followed by the audio in the blackout” 

Construction Post 9: My technical learning curve

I feel that I am extremely advanced when it comes to technology. This has come from my curiosity of computers and computer science since I was little. Saying this, during this project I have been able to familiarise myself further with Adobe Premier pro. A prime example of this is the CCTV shots our group made. I learnt how to distort an image using 'noise' and add a time frame of my choice This allowed us to create a convincing CCTV shot but also furthered my knowledge on the 'effects' side of Adobe PP. 


Another important technical lesson I have learnt is the importance of getting extra footage whilst shooting. This is done to make continuity a lot easier to achieve as you can match shots with the extra footage instead of being limited to just cropped frames. We learnt this mistake from our test shoot and took it into consideration greatly in our final and backup shoot. 


Construction Post 8: My personal contribution to the Edit Sessions

Personally, editing is one of my greatest strengths as I edit my friend's YouTube videos for his account and so I was already familiar with the software and aware of work input needed. This previous experience with Adobe premier pro allowed me to work quickly and efficiently to a high standard. 
I spent all my free study periods on our edit suite and edited about two hours on average each day. Our group also gave a couple of days each week after school to edit, organise the edit and look over work that had been done.


Construction Post 7: My Personal contribution to the Shoot Sessions

I contributed heavily to the shoot sessions as it is something I really enjoy doing. During the shoots, I mainly directed the actors, filmed and thought of 'on the spot' shots that may have looked nice when it came to editing. I oversaw the framing of the other group members' camera work to ensure it was accurate and well framed.



Construction Post 6: Reflections on Edit Week 2

Edit week 2 proved quite difficult for our group and more problems arose than in week 1.

First off, we couldn't create the full sequence on Adobe Premier Pro as we had not yet filmed the Seward studio back up shoot shots. This proved difficult as despite leaving gaps, our sequence made no sense and was extremely difficult for us to identify where these shots would go or where titles would go.

Another problem that arose was continuity errors. Because we filmed on two different weeks at two different times, many factors had changed. During the tube shots, the same people were never passing by at the same time but nothing could be done about this while shooting. Instead, we cleverly cut shots in ways which would not show this error or would show it to a minimal unnoticeable degree.

After filming the Seward studio shots our group editing was behind schedule despite putting in the agreed times. We quickly decided that it would be best if we had another group editing session at lunch and a short 15 minute meeting at break to organise who would do what, when they were editing alone to best utilise our time. This method  proved effective as we managed to get back on track and meet the deadline.


Colour grading wasn't really an issue. Lighting in the bedroom shots was the same throughout and it was brightly lit and so minimal colour grading was needed. During the running shots however it was slightly more difficult; the sunlight would alter slightly from clouds passing and so this changed the saturation of shots to give a slightly altered look. This proved to be the most challenging colour grading as each shot had different amounts of saturation and colour alteration needed to look realistic and fit in with each other.


Our TA focus group liked our sequence and said it had improved since the previous viewings, they mentioned how to ending was still a bit hard to follow and so we then extended some shots and changed the continuity slightly. We were then told that it was a lot “smoother” and “understandable”. Our teachers picked up on more technical aspects such as having the boom microphone in the typing shot, which “although unnoticeable” is “unprofessional” and breaks the “viewers emergence” in the sequence. 



Construction Post 5: The Back-Up Shoot

A backup shoot wasn't entirely necessary but I thought it would be best to redo some shots to make sure they were perfect and have extra footage to give options to alter our continuity sequences.  The video below is of setting up the Seward studio which we used as a HQ on the backup shoot. 


Some shots that were taken on the backup shoot are as follows: 



We utilised the backup shoot and managed to make better continuity tasks. The seward studio shots were a bit grainy and so we added higher key lighting. This made shots less grainy and gave it a better quality feel. The decision to change these shots came from our teachers and peer feedback as they said shots lacked a ‘professional feel’ despite being well framed.



Construction Post 4: Reflections on Edit Week 1

To keep organised and on top of things we stuck to our editing schedule. This schedule was made to suit our free periods and free time as well as having group editing sessions. Our group put in a total of 15 hours between us which helped us to keep on track for our project.

What we have done so far:


  1. Looked over the clips
  2. Renamed the clips
  3. Chosen the best takes
  4. Placed them on the timeline
  5. Roughly cut down the shots
  6. Roughly made a continuity sequence
  7. Cut the shots down precisely
  8. Made accurate continuity sequences

Our editing timeline

Our un-named shots

We decided as a group that our music needs to be changed and so we are looking at new tracks that may fit. We have several and once we lay them down on the timeline we will decide which best fits the sequence. Then edit the shots according to the music. 

Our TA focus group  mentioned how it was quite hard to follow the running shots as although its well edited, it is quite quick and there’s no hint that it will happen. In our backup shoot we are going to add in a few more shots that will come on earlier in the sequence. 

Construction Post 3: Reflections on our Main Shoot Session

Our main shoot was a lot smoother than the test shoot as we were more prepared and experienced. We had changed the shots that didn’t work in our test shoot by making alterations to our storyboard. We created a shootboard that would help us on the shoot as well as altering and using our original shootboard. We had already had practise of the shot types we were going to use and thus made the shoot quicker as setting up the camera took less time as we already knew what shots we wanted to achieve.  Below is a short clip on the main shoot.


Our whole test shoot opening changed, shots were added or removed and we were able to achieve a different feel of the film and connote the story better. Some examples of changes made from the test to main shoot are shown below.

Main shoot

Test shoot

The running shots were changed to be quicker, and have more of a storyline to them without being random. As you can see we added a handheld camera shot to make the audience feel like someone is chasing David, not only this but we changed the ending as it didn't seem that realistic.

Main shoot

Test Shoot

We changed the hacking shots to create suspense and give a feel of who David is. Our CUs, we smoother and our framing was better. We also changed location to my bedroom which had better (more easily altered) lighting. 


Our TA focus group weren't keen on the grainy HQ shots as they said it broke up the overall ‘professional feel’ of the sequence, to change this we are going to re-do them in the backup shoot. Our teachers told us that a way to get rid of the grain in shots was to add more lighting which we will do. 

Construction Post 2: Our Post-Production Kit

Our post production kit was set up by our media department. Our group were allocated an editing suite and given a Macbook to create Titles. 

Our Post-Production Kit List

  1. Macbook Computer
  2. Dual Monitor Edit Suite
  3. Blue Yeti Microphone
  4. LiveType software for creating titles
  5. Adobe Premiere Pro CS 5.5 for editing our sequence


Adobe premier pro was the predominant software that we used to edit our opening sequence. 

We used live-type on our Macbook to create titles which connoted the action thriller cyber security crime genre.  





Construction Post 1: Our Production Kit

Our media department provided us with the following kit:
  1. A Canon Legria HFG30 
  2. A Libec TH65-DV Tripod
  3. A Canon DM-100 Shotgun Microphone
  4. Sennheiser HD 201 Headphones
  5. A standard clapperboard

On the left our camera is set up on shoot and on the right is an image of our kit. 
To release the kit we had to sign for it in our media department and allocate responsibilities (which I took) for the transportation of kit.